Content Bundle Description - Continuous Control Monitoring (CCM)
This article provides a detailed overview of included plans
The solution Continuous Control Monitoring (CCM) currently consists of two content bundles, one for each phase. A CCM project starts with an initial ICS assessment, serving as the basis for customer-specific Continuous Controls implemented afterwards.
Select a content bundle for detailed information on each plan included:
Initial ICS Assessment
1. Download Plan
Download plans define the scope of data extracted from the SAP system.
-
- Table and column overview
The following Excel file contains SAP tables and columns extracted. Select the sheet "SAP Tables ICS Assessment" at the bottom to view relevant tables: CCM RFC authorizations and SAP tables - RFC authorizations
The necessary RFC authorizations are also listed in the Excel file linked above. Select the sheet "RFC Authorizations" at the bottom to view the relevant information.
- Table and column overview
2. Processing Plan
Processing plans define the automated processing of extracted data in zapAnalytics.
-
- Indicator scope
The selection of indicators is tailored to the initial ICS Assessment objective.
The following Excel file contains all relevant indicators, along with a detailed description: CCM Indicators
- Indicator scope
3. Result Plan
Result plans define the output format of the project results.
Once data processing is complete, the following result files can be downloaded from zapAnalytics:
-
- Power BI templates (.pbit)
Template files for report creation.
- Power BI templates (.pbit)
-
-
- General Overview: Overview of SAP usage
- Indicator Overview: Results of indicator analyses
-
-
- zapAnalytics result files (.parquet)
Processed data files - imported into Power BI as source files for reports. - SAP documents per indicator (.xlsx)
One Excel file per indicator listing all SAP documents the indicator has marked.
- zapAnalytics result files (.parquet)
More information on Power BI can be found in this article: Setup Guide Power BI
Curious to learn more about our Power BI Dashboards? Please contact our support team at support@zapliance.com.
Continuous Controls
1. Download Plan
Download plans define the scope of data extracted from the SAP system.
-
- Table scope
The SAP tables extracted depend on the individual controls selected by the customer and zapliance.
- Table scope
2. Processing Plan
Processing plans define the automated processing of extracted data in zapAnalytics.
-
- Indicator scope
The selection of indicators is tailored to the individual controls selected by the customer and zapliance.
- Indicator scope
3. Result Plan
Result plans define the output format of the project results.
The number and formats of the result files are tailored to the agreement between the customer and zapliance.